WORK CENTER IN SAP PP: CREATE, CHANGE, DISPLAY (CR01, CR02, CR03)

WORK CENTER IN SAP PP: CREATE, CHANGE, DISPLAY (CR01, CR02, CR03)

WORK CENTER IN SAP PP: CREATE, CHANGE, DISPLAY (CR01, CR02, CR03)


Work Centers are organizational units where manufacturing activities are carried out.
In other words, the Work Center is the master data that represents the real machine, Production Line, Work Center assembly, etc. Manufacturing activities or Operations carried out at the Work Center.
The Work Center is used in the list of tasks (routing) operations and copied to the production order or process order for planning and implementing shoop floors.
Data Work Centers are used for:
    • Scheduling When a Production Order is created, the duration of an operation can be calculated based on the operating time in the routing and the formula will be entered into the Work Center..
    • Costing The cost of an operation can be calculated in the production order based on the formula entered into the Work Center. Work centers are always associated with Cost Centers
    • Capacity Planning The capacities and formulas available to calculate capacity requirements are stored in the Work Center
  • Work Centers are used in data routing operations.
  • Work Centers are created for manufacturing plants and are identified by code
In this tutorial we will study:
  1. How to create a Work Center
  2. How to change the Work Center
  3. How to see the Work Center

HOW TO CREATE WORK CENTER

Step 1) From the SAP screen open transaction CR01
  • Enter the manufacturing Plant code where the Work Center is created
  • Enter the Work Center code.
  • Enter the Work Center category as "0001" which means the Work Center will be categorized as a machine.
After filling all the fields, click   or press Enter to go to the next screen.
Step 2)  On this screen, the Basic Work Center data will be entered as below.
  • Enter the Work Center description.
  • Enter the code of the person responsible for the Work Center.
  • Enter the physical location where the Work Center is at the factory.
  • Enter Usage as "009" which means the Work Center applies to all types of task lists such as production routes, maintenance of task lists, etc.
  • Enter a standard key value that contains various types of activities used for standard cost calculations.
Step 3) On this screen under "Capacities Tab."
  • Enter the Capacity category as "001" which represents the machine category.
  • Enter the formula process as "SAP006" - this is used to calculate capacity availability from the Work Center.
    SAP006 = (Operation quantity * machine time) / base quantity
  • After filling into the capacity category and processing the formula, click on the button:  
Then another screen will beopened:
Step 4) On this screen under the Capacities Tab, capacity data will be entered.
  • Enter Capacity description.
  • Enter details about the "Input capacity planner group", which is responsible for machine capacity.
  • Enter the factory calendar ID, which has a list of holidays for your plant. then on holidays, the capacity for the Work Center will be left blank.
  • Enter the base unit of measure as "MIN" which means the work center's available capacity will be measured in i.e time. min
  • Enter the time period (start and finish time) for which the Work Center will be available for operation.
  • Enter the capacity utilization percentage% (how much time is used from the standard working time available) from the Work Center to consider damage and preventive maintenance of the machine. Enter the amount of capacity which means a number of similar Work Centers.
  • Check "relevant for limited scheduling and" long-term planning "which shows if there is a capacity limit, the operation is moved to a certain date where it can be processed without capacity limits.
After filling all fields, click   to return to the Overview Work Center Capacity
Then click the "Scheduling" tab from the menu, the system will show on the next screen:
Step 5) On the Scheduling Tab,
  1. Enter the capacity category with "001" which shows the machine category and hence machine time will be the basis for calculating schedule time in production orders.
  2. Input processing formula with "SAP002" which is used to calculate scheduling time.
SAP002 = (Operation quantity* machine time)/ base quantity/no. of splits.
After filling all the fields, click the "Costing" tab
Step 6) On the Costing Tab
  1. Enter a Start and Finish date that shows the validity date of the cost center.
  2. Input center costs on operational costs to be calculated..
  3. Input all activity types and formulas, which will be used to calculate activity costs.
Click the button   to save the new Work Center. The system will give a message in the lower left corner.untuk save Work Cente 

HOW TO CHANGE THE WORK CENTER

We need a change in the work center if the cost center assigned to the work center has been changed by the finance team. If the work center time available for production or% of its utilization has been changed, then we also need to make changes in the work center.
Step 1) From the SAP screen, open the CR02 transaction.
  1. Enter Plant Code.
  2. Enter the Work Center code to be changed.
After filling all the fields, click to see the overview screen in the work center. You can also go directly to the tab that is used
Step 2)
  1. Change the Cost Center or make any modifications, such as when changes are available or% usage in one of the tabs.
After completing all modifications, click to Save Work Center. The system will display a message:

HOW TO SEE WORK CENTER

Step 1) From the SAP Easy Access screen open the CR03 transaction
  1. Enter Plant Code.
  2. Enter the Work Center code to be displayed
After filling all the fields, press enter from the keyboard to go to the overview screen of the work center.
You can also go directly to the tab provided for use.
Troubleshooting
There may be cases where the Cost Center does not exist. For this, you need to create a cost center and maintain an activity type - cost center relationship
If you go to the Technology tab you will get stuck / stuck in the selection of engine type, if so click to leave the tab
The person in charge, the capacity planner group will be configured in the order process by creating a work center
So, continue to another master data ...
Change Purchasing Document System Message Warning to Error

Change Purchasing Document System Message Warning to Error

  1. Enter into the SPRO T-Code
  2. Select SAP IMG Reference
  3.  Then go to Material Management --> Purchasing--> Environment Data --> Define Attributes of System Messages.
  4. Then search according to the application area and No Messages after that change to the System Message Category from W (warning) to E (Error). The example in the picture below is for Application area 06 and message no. 028 with the information Purchase order date is in the past, so if you want to change the following message that initially warning to an error do as shown below.

Thus this article may be useful😀
SAP MM - Material Type Free Tutorial

SAP MM - Material Type Free Tutorial

Materials with several common attributes are grouped together and they are assigned to material types. This will differentiate materials and allow organizations to systematically manage different materials according to company needs. For example: Raw Materials, Finished Products are several material types. Types of materials can be made by following the steps below.

Path SPRO :  
 
IMG >= Logistics General >= Material Master >= Basic Settings >= Material Types >= Define Attributes of Material Types
TCode: OMS2

In the IMG screen display select Define Attributes of Material Types run the icon by following the path above.





After that select new entries




Fill in the required information such as material type name and description. Click save.

Finish
SAP MM - 2 Type Master Data

SAP MM - 2 Type Master Data

SAP Master data consists of two types, namely:
  • Material master data
  • Vendor master data

Material Master Data

 The main points about Material Masters are as follows:
  1. This is the company's main source of material-specific data. This data will include information about materials that can be obtained, produced, or sold or sold by companies.
  2. Because there are different departments in the company and each department does some specific material. So they will enter different information about their material. So each user department has its own view of the master material notes. So, the data screen used to create master material can be divided into two categories.
  3. Main Data: This includes basic data (basic units of size, weight), purchase data (over tolerance and under tolerance), accounting data (standard prices, moving prices). 
  4. Additional Data: This will include additional information such as a brief description of the material, currency, etc.
Introduction SAP MM

Introduction SAP MM

SAP Business Process

SAP MM is known as the SAP Material Management system. The role of SAP MM in business processes is as follows:
  • A business process in SAP is referred to as the "SAP MM Module". 
  • SAP Material Management (MM) is part of the Logistics area and helps to manage an organization's procurement activities from procurement.
  • Supports all aspects of Material Management (planning, controlling, etc.). 
  •  This is the backbone of the Logistics area that combines modules such as Sales and distribution, Production planning, Plant Maintenance, Project Systems, Warehouse Management which are very much related to the Material Management module.

SAP MM Features 

The features of SAP MM system are as follows:

    SAP MM is one of the modules from SAP that deals with material management and inventory management.

    The MM process ensures that there is never a shortage of materials or gaps in the organization's supply chain process. SAP MM accelerates procurement and material management activities making running a business with complete time and cost efficiency.

    This relates to managing material (products and or services) organizational resources with the aim of accelerating productivity, reducing costs and improving improvements and at the same time being flexible to accommodate changes in everyday life.

    This relates to the Procurement Process, Master Data (Material & Vendor Master Data), Account Determination & Valuation of Materials, Inventory Management, Invoice Verification, Material Requirement Planning, etc.

Following is the standard SAP MM process flow



Tutorial Loop in SAP ABAP

Tutorial Loop in SAP ABAP

There may be situations when you need to repeat your code / Looping. In SAP ABAP, statements are executed sequentially: The first statement in a function is executed first, followed by the second, and so on. Loop statements allow us to execute a statement or group of statements several times and the following is the general form of a loop statement in most programming languages.

The ABAP programming language provides 3 types of Loop statements such as:

  1. WHILE loop
  2. Do loop
  3. Nested loop

WHILE loop

WHILE loop statements repeatedly execute target statements as long as certain conditions are true.

The general format of the WHILE command is as follows:
WHILE   

. 
    
ENDWHILE.

while_loop_sap_abap
A block statement can be a single statement or a block statement. While Loop executes the statements attached by the WHILE and ENDWHILE commands until the logical expression becomes false.

Example:
?
1
2
3
4
5
6
7
8
9
10
11
REPORT YS_SEP_15.
  
DATA: a type i.
 
a = 0.
  
WHILE a <> 8.
  
   Write: / 'This is the line:', a.
   a = a + 1.
The output is
This is the line: 0
This is the line: 1
This is the line: 2
This is the line: 3
This is the line: 4
This is the line: 5
This is the line: 6
This is the line: 7


Do loop

The unconditional loop repeatedly makes several statements without specifying any conditions. The DO statement applies the unconditional loop by executing a set of statement blocks several times without conditions.
Syntax
'Times' imposes restrictions on the number of loop paths, represented by 'n'. The value 'n' cannot be negative or zero. If zero or negative, the statement in the loop cannot be executed
do_loop_SAP_ABAP

Example:
?
1
2
3
4
5
6
7
Report YH_SEP_15.
   
Do 15 TIMES.
  
Write: / 'Hello'.
   
ENDDO.
The output is:
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello 
Hello

Nested loop

DO and WHILE statements can be tested and combined with other forms of loops. Each nested loop will have its own SY-INDEX which is created and monitored by the system.
DO [n TIMES]. 
. 
   DO [m TIMES]. 
   . 
   ENDDO. 
ENDDO.
Example:
?
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
REPORT YS_SEP_15.
   
Data: a1 type I, b1 type I.
   
a1 = 0. 
b1 = 0.
   
Do 2 times.
   
a1 = a1 + 1.
   
Write: /'Outer', a1.
   
Do 10 times. 
b1 = b1 + 1.
   
Write: /'Inner', b1.
   
ENDDo.
ENDDo
The output is:
Outer   1 
Inner   1 
Inner   2 
Inner   3 
Inner   4 
Inner   5 
Inner   6 
Inner   7 
Inner   8 
Inner   9 
Inner  10 
Outer   2 
Inner  11 
Inner  12 
Inner  13 
Inner  14 
Inner  15 
Inner  16 
Inner  17 
Inner  18 
Inner  19 
Inner  20

In this example, the outer DO loop is processed twice and the inner DO loop is processed 10 times, each time the outer DO loop is processed. So in this case, the inner loop is processed 20 times.